In all construction zones, motorists are asked to reduce speed, obey posted signs, and use extreme caution, as well as continuing to be cautious of heavy equipment and construction personnel in the area. PLEASE NOTE: Conditions are subject to change without notice. Double fines for speeding in work zones may be in effect.
White Sands Missile Range Notification
For information regarding closures, you may call WSMR at 678-1178 or 678-2222 for updates.
Interstates:
I-10 Business Loop 22, Pine St. Resurfacing Project, Mile Marker 0 to 4.2, Deming
San Bar (Contractor) will be placing arrows and roadway markers on Pine Street. During this process, please use caution for slow moving traffic and lane closures as needed.
I-25 Guardrail Replacement Project, Mile Marker 6 to 14.2, Las Cruces to Dona AnaLC00384
J-H Supply Company, Inc. (Contractor) will be continuing a guardrail and concrete barrier wall project on Interstate 25 from Las Cruces to just north of Doña Ana. Traffic Control and lane closures will be in place 24/7 in both directions for guardrail removal and replacement. Speed limits will be reduced throughout the project. Contractors' working hours are Monday through Friday from 6 a.m. to 5 p.m.
I-25 Roadway Rehabilitation Project, Mile Marker 70 to 85, T or C CN 1102320/1102330
Mountain States Constructors Inc. (Contractor) will be continuing a roadway reconstruction project on I-25 from mile marker 70 to mile marker 85 (Cuchillo). Lane closures will be in place on both the southbound and northbound lanes for guardrail removal and replacement. Speed limits will be reduced throughout the project. Contractor's working hours will be 6 a.m. to 6 p.m. Monday through Friday, with the possibility of weekend work.
I-25 Roadway Rehabilitation Project, Mile Marker 125 to 139, south of SocorroCN1102190
Mountain States Constructors Inc. (Contractor) is continuing a roadway reconstruction project on I-25 from mile marker 125 to mile marker 139(San Antonio). Lane closures will be in place on both the southbound and northbound lanes for milling and paving operations. Speed limits will be reduced throughout the project. Contractor's working hours will be 6 a.m. to 6 p.m. Monday through Friday, with the possibility of weekend work.
I-25 Install of Rekor Site, Mile Marker 182, North of Socorro
MWI, Inc (Contractor) will be installing the Rekor Site Data Management system for the NMDOT Data Bureau. Both northbound and southbound lanes will have lane closures in place as needed for the installation and the safety of our workers and the traveling public. Contractor's working hours will be 8 a.m. to 3:30 p.m. Monday through Wednesday with work concluding by July 15, 2026.
US Roadways:
US 70, Utility installation, Mile Marker 152 to 153, Las Cruces
Renegade Construction LLC (Contractor) will be making repairs along US 70/Bataan Memorial Hwy from mile marker 152 to 153 in the eastbound lanes. Work consists of Utility installation, reconstruction of roadway, shoulder work, signage and striping. Working hours are from 7 am to 4 pm and work is scheduled to be completed by July 17, 2026.
State Roadways:
NM 213 & NM 404, Roadway Widening, Mile Marker 0 to 2, Chaparral E100321/322
FNF Construction Inc. (Contractor) has begun roadway reconstruction project on NM 213 and NM 404. This project was placed into suspension as on February 25, 2026, due to unforeseen issues impacting ongoing construction. Construction is expected to resume mid to late July.
NM 11, Box Culvert, Mile Marker .08, Columbus Port of Entry
Morrow Ent. Inc. (Contractor) has completed roadway paving at the intersection of NM 11 and El Paso Ave, just north of the Port of Entry. Contractor will be on site for guardrail placement, lane closures with a flagging operation maybe in place. Speed limits will be reduced, please obey traffic control devices. The contractor's hours of operation will be from 6:30 a.m. to 6 p.m. Monday through Friday and work is expected to be completed by Fall 2026.
Chip Seal Projects, Luna Co:
The New Mexico Department of Transportation (NMDOT) has begun Chip Seal operations on roadways in the Deming area of Luna County. During operations, drivers can expect flagging personnel, pilot vehicles, and temporary stops. Brooming will occur during and after the sealing process. Loose gravel may remain on road surfaces for a few days post-treatment. Work will take place Monday through Friday, from 7 a.m. to 5 p.m. Note that center striping will be absent in work zones until completion. Roads scheduled for chip sealing, in order:
State Park 1007 (Pancho Villa State Park Roadway) Various I-10 Frontage Roads (Gage area) Frontage Road 1019 (Baker Rd) NM 418, milepost 0 to 14.1 (Old Lordsburg Highway) NM 377, milepost 0 to 1.8 (Pecan Park) NM 143 Stirrup Rd, milepost 0 to 6 (Rockhound campground) NM 198, Spring Canyon Rd, milepost 0 to 2 Various I-10 Frontage Roads (Akela area)
City of Las Cruces Projects:
Lohman Ave. and Walnut St. Intersection
All outside lanes approaching the intersection of Lohman Avenue and Walnut Street will be temporarily closed. The lane closures are expected to remain in place until approximately July 17, 2026. A Mountain Professional Construction will be performing roadway and signal improvements at the intersection during this time.
TXDOT I-10 Project:
Borderland Expressway Phase 2
Closures 7/13/26 through 7/17/26
Monday, July 13 through Friday, July 17, Daily, from 7 a.m. to 5 p.m.
Alternate Lane closures on US54 EB/WB between Mesquite Hills and McCombs. Mesquite Hills reduced to one lane between US 54 and Red Man Dr. Flaggers will be on site directing traffic as needed for haul trucks crossing Mesquite Hills. Flaggers will be on site directing traffic as needed for haul trucks crossing at McCombs and Stan Roberts.
Crews will be transporting earth embankment into the project.
Artcraft Project
Sunday, July 12 – Thursday, July 16, 9 p.m. – 6 a.m. (Nightly)
I-10 east and westbound between Loop 375 (Transmountain) and Artcraft full closure
Crews will be placing steel girders.
Upcoming Closure
Sunday, July 19 – Thursday, July 23, 9 p.m. – 6 a.m. (Nightly) (As Needed)
I-10 east and westbound between Loop 375 (Transmountain) and Artcraft full closure
Crews will be placing steel girders.
TXDOT Roadway Closures can be found at www.drivetexas.com